PROJECT CASE STUDIES
McVeigh Construction has always carried out contracts with the highest levels of care and attention whilst always delivering projects on time within budget.
![IMG_4082[1].jpg](https://static.wixstatic.com/media/7742b8_761a35ba2ba14bc6974645622798ac11~mv2.jpg/v1/fill/w_460,h_345,al_c,q_80,usm_0.66_1.00_0.01,enc_auto/IMG_4082%5B1%5D.jpg)
PRIMARY SCHOOL ALCESTER, WARWICKSHIRE
August 2021
Refurbishment of playground and sports pitch for Our Lady’s RC Primary School Alcester, Warwickshire

SHENLEY FIELDS ROAD
May-August 2021
The replacement of footpaths along Shenley Fields Road in Weoley Castle Birmingham on behalf of Kier Highways working for Birmingham City Council through it’s contract with Birmingham Highway Ltd.

CHALLENGE FUND FOOTWAY SCHEME
January - March 2021
The existing pavements were either of tarmac or slabbed construction and sometimes a combination of both. The footpaths are in a residential setting complete with driveways and/or parking bays. The works involved excavating the existing pavements and disposing of all arisings off site in local licensed tipping facilities.

UNIVERSITY OF WARWICK, COVENTRY
August-December 2020
The scheme involved the construction of two separate sections of a new driveway system for use by autonomous electric vehicles.

NHS CAR PARK, BIRMINGHAM
March-July 2020
The scheme comprised of the extension to the existing car park to provide additional car parking spaces together with the provision of cycle storage, lighting and new road markings.

COVENTRY ROAD, CAWSTON
May 2019 - February 2020
The works were amendments to the existing highway to install a new access point and a ghost island right turn facility for access to a new housing development.

NORTHGATE, WARWICK
May-September 2019
The improvement of the Northgate Junction in Warwick including paving, kerbing, drainage, road construction, signing, lining, street lighting and landscaping.

THE UNIVERSITY OF WARWICK, COVENTRY
January-May 2019
The close proximity of university buildings being constantly accessed by students and others restricted access to carry out the construction.

WARWICKSHIRE COLLEGE, LEAMINGTON SPA
May-June 2017
The works consisted of constructing a new car park extension, resurfacing the existing car park, associated drainage, retaining walls and steps/DDA ramps.

SOUTHAM ROAD, KINETON
April-September 2015
The purpose of the works was generally to provide a new 3- arm roundabout on B4451 Southam Road in Kineton, Warwickshire with subscribed circle diameter of 38m.

"I want to just express my thanks to you all on a successful project and to reiterate that it has been a pleasure to work together"
Divisional Director, Jacobs

"I would like to thank you for carrying out the works in a professional manner, the response to the landscaping changes has been very positive"
Senior Project Manager, University of Warwick

"The Methodist Church have a proper footpath. The residents have a quieter life. All of the streets are still open for access.We have completed an important part of our air quality scheme, the only scheme of its kind in the County."